red room

we had a somewhat slow day today, but we got, so far:
- working toilet (fuck yeah)
- shower stuff, needs the connection, within a couple of days it'll be done
- the red room is up
- hooks for two other rooms are mostly ready
- the kitchen is getting nicer with new furniture

we continue to have issues with water, excess pressure and bad threads. we need a new hydrant.

the sleepover was great, finally we all fit in our bed (there's no bed that's too big for a poly family). we get sunlight all day in the room on both sides, and wake up with sun on our faces. mites are never going to be an issue again!

tomorrow i get back to work, my first day living in a squat and dressing up as if nothing was going on with my life.

godspeed starstuff ☆★☆☆★★★☆☆☆☆☆